11/13/2007

The Hook Up


Once the dust has settled considerabley, I'm directed of the the external load by three crewmembers. Left Gunner, Right Gunner, and the Ramp gunner has began to get in the Cargo Hook Loading Hole. As a team, the Gunners set the aircraft up and make sure that I do not get to close to the personnel on the ground that his holding or placing the cling on the clevis.

No comments:

Post a Comment